ESA Venus Express Status Report No. 68 - Mission Latest
STATUS REPORT
Date Released:
Sunday, April 1, 2007
Source: ESA Venus Express Mission
05 Mar 2007 10:39 Report for Period 25 February to 03 March 2007 During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned.
The table below shows a chronology of the main activities in the reporting period:
| MET (Day) |
Date |
DOY |
VPER# |
Main Activity |
| 474 |
25/02/07 |
056 |
310 |
Routine Mission Operations |
| 475 |
26/02/07 |
057 |
311 |
Routine Mission Operations |
| 476 |
27/02/07 |
058 |
312 |
Routine Mission Operations |
| 477 |
28/02/07 |
059 |
313 |
Routine Mission Operations |
| 478 |
01/03/07 |
060 |
314 |
Routine Mission Operations |
| 479 |
02/03/07 |
061 |
315 |
Routine Mission Operations |
| 480 |
03/03/07 |
062 |
316 |
Routine Mission Operations TM information bit rate increased to 114kbps after pass. |
At the end of the last Cebreros pass in the reporting period (DOY 062, 18:00z) Venus Express was orbiting Venus at 207 million km from the Earth. The one-way signal travel time was 690 seconds.
Payloads
ASPERA The instrument is regularly operated as part of the routine plan.
MAG The instrument is regularly operated as part of the routine plan.
PFS This instrument is OFF and is not operated.
SPICAV The instrument is regularly operated as part of the routine plan.
VeRa Nothing to report.
VIRTIS Nominal operation of VIRTIS continue.
VMC Other than a small data anomaly the instrument continued being regularly operated as part of the routine plan.
Future Milestones
VIRTIS movie passes are scheduled for the second week of April (DOY 98-101). Planning of science operations during this event is now finished. The testing of operations during quadrature is on-going; the next quadrature phase will start in May 2007.
|